The Austin Energy Service Upgrade Process

We publish what the rules actually say about electrical work across the Austin metro — sourced, dated, and specific to your permit office and your utility. The work itself is carried out by electricians licensed by the state.

By the austinelectricalcontractor.net editorial team·Published ·Updated

In Austin Energy territory the utility's service application is filed and stamped before the city permit is submitted, and the utility energises last — so the timeline starts weeks earlier than most people expect.

1Contractor files the utility's service application2Stamped application goes on the city permit3Site visit fixes the point of attachment4Work done, metering equipment installed5City inspects and approves6Utility energises the serviceThe clock starts at step 1, not step 4
The published order. Most delay complaints trace back to step one happening late.

Why the utility comes first

For a residential service change in Austin Energy territory, the utility's own contractor guidance sets the order — and it is not the order most people assume.

The route depends on size. Under 350 amps single-phase, outside the Downtown Network, where the infrastructure already exists, the project takes the lighter “service only” path:

  1. the contractor completes an Electric Service Planning Application and submits it for approval;
  2. the stamped application is attached to the electric permit application filed with Austin Development Services;
  3. a site visit determines the spot location — the point of attachment;
  4. the required metering equipment is installed;
  5. the city inspects and approves the electrical work;
  6. the customer applies for service and sets up billing;
  7. Austin Energy energises the location.

Austin Energy states that the overall project timeline to energisation starts with the submission step, and advises filing early to avoid delays.

Above the threshold, the paperwork changes shape

Projects exceeding 350 amps, or inside the Downtown Network, go through the utility's build portal with materially more documentation: a completed application for each address, a CAD site plan file, a riser diagram, an address verification report, and — for multi-metered projects — a commercial electric permitting application.

If your project is anywhere near that threshold, the practical consequence is that the utility submission is a programme task, not an afterthought handed to the electrician in week three.

Temporary power during construction

Construction power is its own application. For small projects under 350 amps single-phase, the application is marked for construction power or temporary service of less than 24 months and emailed to the utility's planning address; larger projects go through the portal like everything else.

Where the specifications live

The technical requirements — how the service must be designed and installed — are in Austin Energy's Design Criteria Manual, which the utility describes as specifications approved by the City Council for the design and installation of electric facilities. If a contractor's proposal conflicts with it, the manual is the document that wins.

One dated detail worth knowing if you are budgeting: from 15 April 2026, traffic control plan, right-of-way permit and related setup or breakdown fees are included on a project's final design invoice where required.

This is Austin Energy's process, not everyone's

Austin Energy's published service area is roughly 437 square miles, and only about half of it sits inside the Austin city limits. It describes its territory as covering “all or portions of” Bee Cave, Village of the Hills, Lakeway, Rollingwood, Westlake Hills, Sunset Valley, Creedmoor, Del Valle, Pflugerville and Cedar Park.

Portions. Which is why this page is titled after one utility rather than the metro. If your bill names someone else, their process applies, and it is not safe to assume it matches this one. San Marcos makes the point most plainly: the city itself says there are three electrical providers within its limits and tells residents to check a service area map to find out which one is theirs.

Common questions

What is the 350-amp threshold?
Below it, single-phase and outside the Downtown Network with existing infrastructure, a service change takes the lighter service-only route. Above it the submission needs a site plan, a riser diagram and an address verification report through the build portal.
When does the clock start?
Austin Energy states the overall timeline to energisation starts at the submission step, and advises filing early.
Who energises the service?
Austin Energy, last — after the city has inspected and approved the electrical work and the account is set up.
Does this apply outside Austin?
Only in Austin Energy's territory, which covers all or portions of several neighbouring cities. Check the utility named on your bill.

We will connect you with a contractor licensed by the state to do it, in the city where your property sits.