What we do
Commercial Electrical Contractors in Austin
We publish what the rules actually say about electrical work across the Austin metro — sourced, dated, and specific to your permit office and your utility. The work itself is carried out by electricians licensed by the state.
Commercial work covers tenant fit-outs, service and distribution for new premises, lighting and controls, equipment circuits, and the coordination between all of that and the utility. The scale changes the process, not just the size of the conductors.
Why this job is different in Austin
There is a real threshold in Austin Energy's own published process, and it is where residential-style expectations stop working.
Below 350 amps single-phase, outside the Downtown Network, with existing infrastructure, a service change runs the lighter “service only” route: an application, a stamped copy attached to the city permit, a spot-location visit, metering, inspection, energisation.
Above 350 amps, or inside the Downtown Network, the submission is materially heavier: an application per address, a CAD site plan, a riser diagram and an address verification report, submitted through the utility's build portal, plus a commercial permitting application for multi-metered projects. Austin Energy states that the project timeline to energisation starts at the submission step and advises filing early to avoid delays.
Worth knowing why this page exists at all: in this market the phrase “electrical contractor” is largely a commercial-sector term. Search it and you get commercial and industrial firms; search “electrician” and you get residential. If you arrived here on the commercial side, this is the page you wanted.
How to tell you need it
The service question is usually decided by the equipment schedule rather than the floor area — kitchens, refrigeration, machining, medical imaging and vehicle charging all move the number quickly.
If your project involves any of a new service, a service increase, a downtown address, or multiple meters, treat the utility submission as the first task on the programme rather than something the electrician handles later.
What it costs
Commercial pricing is scope-driven and we do not estimate it. The programme risk is usually the more expensive variable: an energisation date that slips affects fit-out, occupancy and rent, and it is set by when the utility submission went in.
Permits and inspection for this work
Permits and utility approval run in parallel and interlock — the stamped service application belongs with the permit paperwork. Multi-metered projects have their own commercial permitting application. Confirm the current requirements with both the utility and the permitting authority for the address; this page describes the published process, not a determination for your project.
Related work
Worth reading before you call
- Electrical Permits in Austin
- How to Check an Electrician's Licence in Texas
- The Austin Energy Service Upgrade Process
- Electrical Warning Signs to Act On Now
Where we cover
- Austinone utility
- Georgetownpage in progress
- Round Rockone utility
- Cedar Park2 possible utilities
- Pflugervillepage in progress
- Leanderone utility
- Lakeway2 possible utilities
- Dripping Springsone utility
- Kyle & Budapage in progress
- San Marcos3 possible utilities
Common questions
What changes above 350 amps?
When should the utility application go in?
Do you handle residential too?
Talk to an electrician about this job
Tell us which city you are in and what you need done, and we will connect you with a licensed contractor who works your area.